Projects List - old, but currently being updated
For an up-to-date list, contact Floyd Hoffman, coordinator of Facilities and Maintenance.
Priority
Kitchen/Dining Room
• Replace sink faucets
• Install shelves on the wall that have lockable doors (near water heater)
• New floor (tile)
• Repair entrance doors in kitchen and dining room
• Change door handles/knobs
• Repair walls (holes)
• Paint
Boys' Room/Dorm
Bathroom
• Replace sink faucets
• Install new linoleum on floor and install baseboard
Room 1
• Install closet doors
• Install closet floor (linoleum)
• Build 2 sturdy four-drawer dressers
Room 2
• Build 2 sturdy 4-drawer dressers
• Repair broken floor tile
• Install interior entrance door to Teenage Boys' Room
Boys' Living Room
• Construct book shelves across one wall
Girls' Room/Dorm
• Repair closet doors
• Change interior door (in front of the closet)
• Change interior door and install new door handle
• New paint
• Build book shelves in "Rincon de Cuentos" - room adjacent to girls' interior bathroom
• Repair closet doors
• Change interior door (in front of the closet)
• Change interior door and install new door handle
• New paint
• Build book shelves in "Rincon de Cuentos" - room adjacent to girls' interior bathroom
Girls' Bathroom
• Install ceramic floor tile
• Change exterior door and install new door handle
Babies' Room / Nursery
Baby Girls' Room
• Install closet doors
• Construct a large sturdy dresser inside the closet
• Repair bathtub faucets
• Install new linoleum bathroom floor
• Install new linoleum in raised bathtub area
• Change entrance door and install new door handle
Nanny's Room 1
• Construct a large sturdy dresser inside he closet
• Install closet doors
• Paint
• Change entrance door and install new door handle
Nanny's Room 2
• Construct a large sturdy dresser inside he closet
• Install closet doors
• Paint
• Change entrance door and install new door handle
• Replace outet covers
• Replace switch covers
• Install new floor tile
Boys' Room
• Construct a large sturdy dresser inside the closet
• Install closet doors
• Paint
Ironing Room
• Install new door
• Install doors over blanket shelves
• Replace outlet covers
• Replace switch covers
• New ceiling
Kitchen
• Paint white
• Install new baseboard
Living Room
• Remove the electrical outlets in Children's Playroom
• Paint
• Replace entire suspended ceiling
Orphanage Outside/Grounds
• Remove and construct a new outside sink facility with new faucets
• Paint exterior wall on buildings
• Construct a new Visitors' Shower and Bathroom Facilities
• Install concrete driveway from entrace gate to join existing concrete near buildings with the width approximately from the Basketball court to the Clinic/Office Building
• Complete the construction of the concrete wall 6-feet high that separates Ramon and Magdalena's property from the Orphanage
• Install chain link fencing on top new wall that separates Ramon and Magdalena's property from Orphanage grounds and construct a high chain link fence along the north end of the Basketball Court
• Install a new wall along the front of the Orphanage property adjacent to the street
• Install an electric gate closer on the north gate of the new property
• Replace toilets with efficient water saving toilets